Home Recommend Contact Print Sitemap
 
Construction work will be carried out in stages from October 2009 to May 2011
  • Remodelling of Alpnachstad bottom station: opening May 2010
  • Total renovation of Hotel Pilatus-Kulm: opening May and August 2010
  • Total renovation of Hotel Bellevue gastronomy: opening December 2010
  • Construction of new Panorama Gallery and logistic building on Pilatus Kulm:
    opening May 2011
Building and renovation work will largely be concentrated on Pilatus Kulm. The bottom station at Alpnachstad will be renovated during the winter break and handed back to guests in good time for the start of the summer season in May 2010.

Services on Krienseregg and Fräkmüntegg will continue as usual. The world's steepest cogwheel railway, the aerial cableway and the panorama gondolas will continue to run to schedule without any timetable reductions.





© 2004 PILATUS-BAHNEN, info@pilatus.ch, Switzerland |  Impressum |  Legal Disclaimer |   |   ISO 9001 |   ISO 14001
Do

4°C
3°C

 
Fr

5°C
3°C

 
Sa

9°C
6°C

 
Deutsch | English